Thursday, 10 May 2012

FINAL POSTING


Assalamualaikum, in the early semester, we have been given a briefing from our lecturer, Sir. Azril Bin Othman about our project which is designing a website for our client. The function of the site is to introduce the new products of our client company to users all over the world and the new products produced is to enhance the client income. The objectives of this project is to create new concept store, to produce new products for client, to sketch a new products plan and to create the product brand. In the first week, we have been told to form a group which is 4 person in a group and there where my group is formed, Oritras Group. After forming a group, every group must find one small company to create a website and new products for the company. After finishing all those terms, we have been asked to make group profile documentation and make a presentation about “Group Profile Presentation” which introduced our group and every single person in the group with the tasks. We also have found our client which is Zaktar Enterprise, and we have produced new products for the client which is Zaktar Spa Enterprise. Zaktar Enterprise is about a healthy products such as herbs drink, zaktar leaves, robe, herbatulsauda honey and more.
Next, in week 2, we have to create 6 website designs and make presentation about all the website which is “Website Design Presentation” and one of the best design will selected. Around week 3, we have given a task to make project proposal documentation which include the client signature in the document and present about it, “Project Proposal Presentation”. In week 4, every group must make project specification documentation which also needed the signature of the client. Around week 6, we started to create and design the real website of our client products. In this creation, we used Dreamweaver Software (HTML), Adobe Photoshop, and browser. Every week all groups must show their progress to our lecturer. If there any mistakes, our lecturer will gave an advices and ideas how to overcome with the problems. After the website design is almost done, we have to make a presentation of “Website Presentation” to explain about the website.
Last but not least, after all those tasks is successful and complete, we have to make our final presentation of “Final Website Presentation”. In those final presentation every group will be judge with judges in those room including our lecturer. After presentation we need to make final documentation. Lastly, we need to customized our file and send to our lecturer last of the final week which in the exam week. Besides all this works and tasks, every week we must fill in our progress report, make minutes meeting and memos about all the week meeting that we have made and put all of it in the file.

Saturday, 5 May 2012

ALREADY FINISHED MPM


Thank to all member of a group oritras.
Thank you to oritras member of a group because give commitment that good when conducting assignment in this semester.
To lecturer Sir Azril, group oritras say thank give because gives us more knowledge, experience and hope in Multimedia Project Management.we hope oritras group success in Multimedia Project (MPs) in next semester (semester 5).
thank you.

COMPLETE THE WEBSITE

Final website is already.
link for our website
www.oritras.my

Wednesday, 25 April 2012

PUBLISH THE WEBSITE

www.oritras.my

Final Presentation MPM


30.04.12 - Test Run Product
02.05.12 - Final Presentation
03.05.12 - Final Presentation
04.05.12 - Final Presentation

You are only ALLOWED to present ONLY when
01. Punctual and complete attendance as a group.
02. All members are in perfect KPTM Student Attire
03. No Powerpoint Error
04. No Product Error (especially Screen Resolution issues)

Tips for Website Developer
01. Make sure the product can be view using Internet Explorer 8
02. No horizontal scrolling
03. Resolution 1024x768
04. Test your product online

Tips for CD Developer
01. Make sure you burn Compact Disc NOT DVD
02. Full screen apps
03. Resolution 1024x768
04. Test your product on CD with CD Label

MEETING MINUTES

DATE: 14 APRIL 2012
TIME: 12.00 PM
VENUE: KFC MEDAN GOPENG
PRESENT : SHAZLYDIA BINTI SHIRAJUDDIN
                   SOLLEHA BINTI ABDUL RAHMAN
                   MUHAMAD QAYUM ASYRAF BIN ALIAS
                   NUR FATIN BINTI MOIN
                 
MEETING AGENDA:

1.Edit the website group

2.to complete a  final power point presentation slide

3.the meeting was andjour at 14 April 2012.
                 

Sunday, 1 April 2012

Gantt Chart


Meeting Minutes

DATE: 1 April 2012
TIME: 11.30 A.M.
VENUE: KFC Medan Gopeng
PRESENT: Shazlydia Binti Shirajuddin
                   Solleha Binti Abdul Rahman
                   Muhamad Qayum Asyraf Bin Alias
                   Nur Fatin Binti Moin


MEETING AGENDA  :

1.Create a storyboard


2.To complate a style guide


3.Edit Website Group 


4.         The meeting was adjourned 1 April 2012


Tuesday, 28 February 2012

Wednesday, 22 February 2012

answer and question (22.02.2012)



1. what is the standard browser in Malaysia?
answer : internet Explorer
2. what is the standard web resolution?
answer : 980-1000  below 768
3. what is standard CD resolution?
answer : 800 x 600
4. what is the new technology that will replace flash video?
answer : HTML 5
5. what is the main reason we choose director instead of flash for CD package?
answer :
6. where are the best position for the button website?
answer : left side
7. where are the best position for the button CD package?
answer : no best position
8. the best choice between icon , button , text?
answer : button, because it have both text and icon
9. what is montage ?
answer :The group introduction with animations and sound
10. differentiate between CD and DVD?
answer : capacity of CD is 700MB meanwhile DVD is 4.7GB or higher
11. what is domain and what is hosting?
answer :
domain = www.(domain name).com
hosting = a place where website data are stored
12. what hardware has the biggest effect on computer performance?
answer : hard disk

Thursday, 16 February 2012

ORITRAS PROPOSED PROJECT PRESENTATION





1. Website


Easy to update
Expose to all users
The cost of creating a website is low
No charge to users
Always available


2. The introduction of Zaktar
No 4 Lengkok Pegoh, Taman Pengkalan Jaya 31650 Ipoh Perak


3. Its about health products:
Herbs drinks
Healthy foods
Healthy bath/shower
Clothes (robe)


4. The products used:
Zaktar leaves
Yaman pure honey
Habbatuusauda oil
Yaman herbs tea
Black Yaman robe


5. Project Objectives:
Introduce the products brand
Improve the products types
Improve the quality of the products
Make a new products plan for client


6. Target user:
a) Age - 25 years old and above
b) Gender - female and male
c) Culture – Malays


7. Benefits of Proposed Project (benefit to client):
Have a name for their products
Produce a new products
Get a good quality of products
Get a new plan for products




8. Project Module and Page with Sitemap:
Home
- Pictures of the logo
About Us
- Introduction of the products
Products
-pictures with information
Services
- Reservation, post, credit card, spa
Gallery
- Products Pictures
Contacts
- The place of the company
- The phone number of the client.




Project Module and Page with Sitemap





Design and Colour Scheme:
WEB PAGE DESIGN






Colour Scheme

name:bodytech



10. Final Product Cost:
11. - Rm 130 per page
- 20 pages x Rm 130 = Rm 2600
12. Service Cost:
- Update in every 2 month = Rm 130
13. Total Product Cost:
- Rm 2730



Wednesday, 15 February 2012

GROUP PROFILE PRESENTATION


















ORITRAS GROUP LOGO


NAME    


ORI              : represent the originality of the group work
TRAS          : taken from the word trust, which mean the work, ideas, time, 
                       design and others that we gave can be trusted.
SHAPE  :

3 Triangle        : represent 3 members in       

                              the group (not including leader)

Diamond         : represent the leader of                          

                              the group

O letter            : represent the first letter of the               

                                group name
RITRAS letter : represent the balance letter             
                               after O letter
COLOR  :
Purple            : the flow and ways of our            
                              group
Black              : the strength of the group
White              : the neat and tidy of our work,            
                            the pure surface that our     
                            group always need to design 
                            and create.

Monday, 13 February 2012

ALL GROUP MEMBERS ( ORITRAS )


ALL GROUP MEMBERS 


                       Project Manager and Evaluator


SHAZLYDIA BINTI SHIRAJUDDIN
  PTM100702253 :
Task
-To manage the group work to be done effectively
-To evaluate and check the right or wrong of any work


Assistant Project Manager and Multimedia Programmer

SOLLEHA BINTI ABDUL RAHMAN
  PTM100702266
Task
-to help the project manager when he/she need a hand and manage the group when the project manager are absence
-to creating websites according to the specification needed.


Graphic Designer

MUHAMAD QAYUM ASYRAF BIN ALIAS PTM 100702090
Task
-To design then interface of the group and the requirement of client needed

AV Specialist
NUR FATIN BINTI MOIN
PTM100702424
Task
-To manage and design videos or sound for the group and client
  

WeLcoME To My GrouP MemBEr (MPM)

WELCOME :D